“Hualing Tbilisi Sea New City”, located in Tbilisi, near Tbilisi Sea is the largest project of Hualing Group in Georgia. The project area occupies 420 hectares of land. The estimated completion time is ten years.
Tbilisi Sea Residence is situated in one of the most ecologically clean, healthy and safe area in the city, but still very convenient location and easy connection with the city center.
Hualing Tbilisi Sea Plaza is the very ambitious project of Hualing Group. This 5 floor building with the total area of 110 000 sqm, represents the biggest shopping center in Caucasus, operating since September, 2017.
The project has a strategic location in the capital of Georgia, and is well connected to Tbilisi international Airport and railway station, close to the city center. Total construction area of wholesale and retail trade complex is 300,000 sq.m. Tbilisi Sea Plaza is also represented by chain of pavilions, where various business entities from different countries carry out their business operations.
The competitive and comfortable conditions is obvious to everybody, who enters our space. Different products are imported from all over the world, mainly directly from factories.
Together with the perfect location, favorable conditions for every businessman, modern logistics center with customs warehouse zone and convenient system of warehousing, a big car parking zone, 24-hour control of the whole territory, Hualing Tbilisi Sea Plaza gradually becomes an attractive destination for people not only in Georgia, but the whole region.
Hotels & Preference Hualing Tbilisi offers visitors a broad variety of facilities to make their stay as enjoyable as possible such as a 25-m long indoor swimming pool, a gym, a 3D simulation golf, European, Asian and Georgian cuisines “Be CHIC”, and a Chinese restaurant “Ensemble”.
In 2012, Hualing Group acquired a controlling interest in commercial bank of Georgia – BasisBank
Hualing Group contributes significantly to development of Georgian wood industry. In 2009 company obtained 20 years license for annually 88000 cubic meters wood processing right. At present, annual deforestation is 30 000 cubic meters and it’s much less than allowable volume of deforestation.